Site West runs under a flexible-load agreement with the regional grid operator: in exchange for a lower power rate all year, we agree to reduce load on request during demand peaks - typically a handful of late afternoons in July and August.
What actually happens
A curtailment request arrives 30 to 60 minutes ahead. The site controller ramps the affected racks down over ten minutes; when the peak passes, they ramp back up. The whole event usually lasts one to three hours. Machines are not switched off hard, so there is no thermal shock and no restart wear.
Why your reward does not drop
Plans are backed by more hash power than is sold. That reserve covers maintenance, hash-board swaps and curtailment hours, so a two-hour event in Texas does not change the day's reward for any plan. The event does show up in the monthly report's uptime figure, which is why Site West sits a fraction below the other two sites in summer.
Why we do it at all
Cheaper power is the single biggest lever on plan prices. A few curtailed hours a year in exchange for a materially lower rate is a trade every serious operator in Texas makes - and it makes us a better neighbour on the grid.