Every month we publish the numbers the operations team works from. August in one line: 1 840 machines online at month end, 3.2 PH/s installed, fleet-wide uptime 99.93%, weighted efficiency 14.1 J/TH.
By site
Site North (Tromsø, 780 machines, air-cooled): 99.97% uptime; one hash-board replacement round on the S21 Pro racks, 14 boards swapped. Site West (Central Texas, 640 machines, hydro): 99.86%; two curtailment hours on 19 August during a grid peak, as the flexible-load contract allows. Site East (Central Anatolia, 420 machines, immersion): 99.95%; the second planned tank-fluid filtration completed without downtime.
Efficiency
The S23 Hydro racks that came online at Site West in August pulled the fleet average down from 14.6 to 14.1 J/TH. The remaining S19-class units at Site North are scheduled for replacement in Q4.
How this affects you
Your plan's hash power is fixed for its term; uptime is what decides how much of it actually hashes. Curtailment hours are covered from the reserve pool, so August's two hours in Texas did not reduce anyone's daily reward.